Voltage, enclosure, connector and firmware: what can be changed, and at what cost.
Cells, voltage and capacity
Voltage and capacity are the easy changes; cell choice decides cost and cycle life.
- What Customization Services Do Chinese Manufacturers Provide
- How To Use Hyster Power Cellect Effectively
- How To Make A Parallel Battery Connection Safely
- What Voltage Does A Pencil Battery Usually Have
- How To Wire Batteries In Parallel Or Series
- What Makes ProSeries Battery Chargers the Top Choice for Tech Enthusiasts
- Which Is Better: Wiring Batteries in Series or Parallel
- How to Effectively Connect Batteries in Series and Parallel
- Wiring Two Batteries in Series: A Comprehensive Guide
- Can I Connect a 200Ah Battery with a 100Ah Battery in Series
Enclosure, connector and branding
Enclosure and connector changes drive tooling; label and branding do not.
- The New EU Battery Regulation: What Brands Must Know
- What Details Are In CS Agility Case Study
- Are All Battery Brands Essentially The Same
- What Batteries Does Crown Brand Offer
- Features of a Waterproof and Submersible Mobile Power Station
- Is GreenWorks Pro a Good Brand
- Do Battery Terminals Have to Be the Same
- Why Battery Terminals Can Be Different Sizes
- Are All Battery Terminals 10MM in Size
- Battery Terminals, Comprehensive Look at Types and Functions
OEM & sourcing questions
The questions that come before an order.
What does OEM/ODM actually mean here?
OEM: we build to your specification and put your label on it. ODM: you choose from our platform and we adapt it — voltage, capacity, enclosure, connector and firmware.
What is the minimum order quantity?
It depends on how much changes: a label change starts low, a new enclosure or BMS firmware starts higher. Tell us the change and we will quote the threshold honestly.
Can you match my existing BMS protocol?
Usually. Send the protocol or the host device and we will confirm whether we adopt it or emulate it — this is the first question in any private-label project.
How long does a custom pack take?
Four to eight weeks from specification sign-off for a modified platform; a fully new enclosure or BMS takes longer and we will say so before you commit.
What certification can you supply?
UN 38.3 for transport, IEC 62619 for industrial cells, CE documentation, and UL or site-specific standards on request.