Autonomy days and critical loads

Decide which loads must survive, then how many days — most systems are sized for two days of critical load.

Recharge window and generator backup

Check the array or generator can refill the bank between events, or autonomy is theoretical.

Voltage & sizing questions

Short answers to the ones that come up most.

How do I choose a battery voltage?

It is set by the equipment: 12V small loads, 24V light traction, 48V storage and most traction.

How do I work out runtime?

Amp-hours times nominal voltage for watt-hours, divided by the real load, minus 10–15% losses.

Why is a 12V lithium battery 12.8V?

Four 3.2V LFP cells in series; 12V equipment accepts the range.

What does C-rate mean?

Current relative to capacity — 1C on 100Ah is 100A.

Can I series-connect different batteries?

No — same model, capacity and age, or the strings unbalance.