Backup & Autonomy Sizing

How many days of reserve, and what that costs.

Ask a technical question

How many days of reserve, and what that costs.

Autonomy days and critical loads

Decide which loads must survive, then how many days — most systems are sized for two days of critical load.

Recharge window and generator backup

Check the array or generator can refill the bank between events, or autonomy is theoretical.

Voltage & sizing questions

Short answers to the ones that come up most.

How do I choose a battery voltage?

It is set by the equipment: 12V small loads, 24V light traction, 48V storage and most traction.

How do I work out runtime?

Amp-hours times nominal voltage for watt-hours, divided by the real load, minus 10–15% losses.

Why is a 12V lithium battery 12.8V?

Four 3.2V LFP cells in series; 12V equipment accepts the range.

What does C-rate mean?

Current relative to capacity — 1C on 100Ah is 100A.

Can I series-connect different batteries?

No — same model, capacity and age, or the strings unbalance.

Back to Charging & BMS · All Redway guides

Search products
Product has been added to your cart


Shenzhen Redway Power, Inc

Tel: +86 189 7608 1534
Tel: +86 (755) 2801 0506
E-mail: [email protected]
Website: www.redway-tech.com
Youtube: @RedwayPower
TikTok: @redwaybattery

Get a Quick Quote

Hot OEM

Forklift Lithium Battery
Golf Cart Lithium Battery
RV Lithium Battery
Rack-mounted Lithium Battery

Hot Batteries

24V 150Ah Forklift Lithium Battery
24V 200Ah Forklift Lithium Battery
48V 400Ah Forklift Lithium Battery
48V 600Ah Forklift Lithium Battery
80V 400Ah Forklift Lithium Battery
36V 100Ah Golf Cart Lithium Battery
48V 100Ah Golf Cart Lithium Battery
51.2V 50Ah 3U Rack-mounted Lithium Battery
51.2V 100Ah 3U Rack-mounted Lithium Battery
12V 100Ah RV LiFePO4 Lithium Battery (Self-heating)

Hot Blog

Golf Carts
Server Rack Battery
Knowledge